Week beginning 25 May 2020

We will be starting to work some Saturday mornings as of next week (23/05/20). It will only be between 8am and 1pm and will not be every Saturday.

There will be NO deliveries on Saturdays.

------------------------------------

Week commencing 11 May 2020

Could I please request the residents of Higher Heyes to (just while the lads are here this week) please refrain from parking on the pavement.  This is while the BT Ducting is being installed.

 

- BGS utilities will be installing the BT duct all the way up Higher Heyes drive starting Monday 11/05/2020.

- Concrete wagons coming to site intermittently whilst the road drainage is going in. There should be no more than 1 a day and it wont be every day just as and when its needed. This will increase when the foundations for the houses start

------------------------------------

 

From Wednesday  6 May 2020

- Concrete wagons coming to site intermittently whilst the road drainage is going in. There should be no more than 1 a day and it wont be every day just as and when its needed. This will increase when the foundations for the houses start

------------------------------------

Deliveries scheduled for Monday/Tuesday 04 and 05 May 2020

- 1 Artic lorry of concrete drainage pipes

- 10 Rigid Lorrys ( mainsway) of 10mm pipe bedding

- Tuesday early the road sweeper is being replaced ( small flatback wagon)

 