![]() The message suggests that you are in arrears and goes on to say there is a Warrant for your arrest unless you reply by pressing 1 to answer. DO NOT PRESS 1 AS THIS WILL CONNECT YOU TO A PREMIUM RATE LINE. DO NOT RESPOND TO THIS TYPE OF CALL. HMRC will NEVER contact you in this manner. Never supply any personal information over the phone. If you have any doubts as to the identity of a caller hang up and contact the organisation through their official site to check. #beatfraud
![]() |
||||
Message Sent By |
Site Manager: Ian Forber | Mobile: 0776 486 5200 | Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
---------------------------
Week beginning 1 June 2020
Deliveries
Monday Wednesday and Friday (afternoon) - mortar deliveries.
We have a concrete block delivery scheduled for Monday but I am trying to postpone that for a week.
------------------------------------
Progress Update
Recent photographs can be viewed at https://photos.app.goo.gl/tw7pLbepjnt9xpK89
I estimate we are running at approx 90% capacity at the moment which for the current situation is superb.
The lads from Rigby civils are certainly pulling out all the stops and good progress is being made.
DRAINAGE – The attenuation tank went in just prior to lockdown, the Hydro brake at the site entrance is dug and concreted with the 900mm concrete surface water drain running into it from the newly formed road.
The surface water drain is to be completed week ending 29 May 2020 and from 1st June work will commence with the foul drainage to the site.
BT - BT ducting is now in on Higher Heyes drive and while the lads where there they connected the electric ducting up to the hammer head so all that’s left to do in the drive is connection which is only very minor disturbance and I will let you know when I have a date for that.
FOUNDATIONS – We currently have plots 3 to 9 underway. Plots 3 and 4 ( Bungalows) are dug, concreted and have block work footings being built. Plots 5 and 6 are dug and concreted, Plots 7, 8, 9 are dug and were inspected on 29 May 2020.
Garden Waste collections were suspended in March at the start of the coronavirus pandemic lockdown as staff sickness levels in the workforce increased, and this decision ensured the domestic waste and recycling service could continue to operate as normal
Staff sickness levels have fallen in recent weeks and more staff are now available to collect residents’ garden waste in addition to providing the usual service.
What is happening
Collections will return to the previously advertised schedule and we will continue to monitor the national Covid risk rating, infection rate, and the continued availability of staff in the weeks to come to ensure we can continue to run all services while ensuring staff safety.
|
||||
|
||||
![]() Temperatures are set to rise over the next few days, please do not leave your dog in a car (sadly some do) as we may have to force entry to your car to save the dog and you could be prosecuted. Dogs die in hot cars, It is cruel. Don’t do it! #dogsmattertoo
![]() |
||||
Message Sent By |
Site Manager: Ian Forber | Mobile: 0776 486 5200 | Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
---------------------------
Week beginning 25 May 2020
We will be starting to work some Saturday mornings as of next week (23/05/20). It will only be between 8am and 1pm and will not be every Saturday.
There will be NO deliveries on Saturdays.
------------------------------------
Week commencing 11 May 2020
Could I please request the residents of Higher Heyes to (just while the lads are here this week) please refrain from parking on the pavement. This is while the BT Ducting is being installed.
- BGS utilities will be installing the BT duct all the way up Higher Heyes drive starting Monday 11/05/2020.
- Concrete wagons coming to site intermittently whilst the road drainage is going in. There should be no more than 1 a day and it wont be every day just as and when its needed. This will increase when the foundations for the houses start
------------------------------------
From Wednesday 6 May 2020
- Concrete wagons coming to site intermittently whilst the road drainage is going in. There should be no more than 1 a day and it wont be every day just as and when its needed. This will increase when the foundations for the houses start
------------------------------------
Deliveries scheduled for Monday/Tuesday 04 and 05 May 2020
- 1 Artic lorry of concrete drainage pipes
- 10 Rigid Lorrys ( mainsway) of 10mm pipe bedding
- Tuesday early the road sweeper is being replaced ( small flatback wagon)
Click here for full calendar